Can I build these plans outside Tennessee?
Yes, but your local building department may require changes, energy documents or a local engineer's or architect's stamp. The CAD add-on lets a local professional adapt the drawings.
Are the plans stamped by an architect or engineer?
No. Tennessee generally allows one- and two-family dwellings designed to the International Residential Code without a registered architect or engineer, but other places differ. Foundations on steep or unusual lots may need site-specific engineering.
What does the license allow?
The Construction edition includes one build. Each additional cabin needs an additional build license. See the Plan License.
Does buying a plan mean I can rent the cabin?
No. Zoning, HOA and short-term rental rules are separate. Check them before you buy land or build.
What's the difference between "Built & hosted" and "In design"?
"Built & hosted" plans are drawn from a cabin that has been built and rented to guests. "In design" plans are new designs that have not been built yet.
How do I get my files?
Downloads are delivered by email and on your order confirmation page right after purchase. Trouble? Email support@strreadycabinplans.com.